The Peninsula London

Complex building technologies systems, delivered working.

The building technologies systems are the last thing to go in — and the first thing that can put a programme at risk. Our job is to take that risk away. We do what we promise, when we promised it. For 34 years.

Lisburn · London · Est. 34 years

Track record

34years

Delivering complex building technology systems

Right before it ships

Every system integrated, connected and commissioned offsite — witnessed working at OKTOLabs before delivery

8-phase OKTOLabs testing

Blackout building tests offsite and two-week soak tests offsite, run on the release-candidate software

Commissioning assurance

Offsite commissioning & onsite optimisation

Philip Dowds at OKTOLabs beside integrated technology racks
OKTOLabs · Lisburn

We Deliver

Digital estate & building operating systems

Audio visual, IT & communication

Building management, automation & lighting

Command & control, data centre & UPS

At OKTO you deal with one team, with specialist expertise across every discipline — Digital Estate and Digital Building Operating systems, Building Management, Audio Visual and IT.

A senior director is accountable on every major project, involved from concept to completion and directly contactable at all times. When you need a decision or an answer, you get it from someone with the authority to give it. And you get the same people every time — the team that delivered your last project delivers the next one.

Deadlines get met because we do whatever it takes to meet them.

01 · How we work

How we work

Most of our projects bring multiple building technology and communication systems together into one building. That complexity is our problem to manage, not yours.

34 years has taught us that the best results come from getting involved early. When we sit down with you, your design team and your construction team at the start, we understand exactly what you need the building to do — and we design the technical systems around that outcome, not the other way round.

Before anything reaches site, we run technical workshops, R&D and proof-of-concept testing with the manufacturers, and build custom pieces where your project needs them. You get systems proven to work before they are installed, not promises that they will.

Everything is brought together on identical open source software. For you, that means one way of operating the building instead of a different interface for every discipline — simpler for your team to run, and simpler to manage for the life of the building.

Building management control panels staged on the OKTO test bench
Bespoke control systems · staged in house

02 · Responsibility

One company, responsible for all of it

AV and IT, lighting controls, BMS, guest room management — one integrator, one point of responsibility.

When something doesn't work in the last week of a job, you don't want three specialists blaming each other in front of your client. With OKTO there is no gap between trades for a problem to fall into. If it's a system, it's ours, and we sort it.

03 · Engineering · OKTOLabs

Offsite production, commissioning and integration testing

OKTOLabs workshop with racks staged for offsite commissioning

Every system we deliver is fully staged and commissioned off-site before it goes anywhere near your building — including full integration testing with the running firmware, the finalised release-candidate software and the completed graphics.

We build, commission and programme the systems at OKTOLabs, our facility in Lisburn, and invite you and your stakeholders to witness them working. Any anomaly with the equipment or the user experience is found and fixed there — not discovered on your site, in the last weeks of the programme.

For you that means three things. The biggest risk in any building technology programme — commissioning problems on site — is dealt with before delivery. Our time on your site is kept to a minimum, after your finishes are in. And what's left for site is proving the working systems in your building and tuning them, so your programme is shorter and more certain.

In occupied buildings, the same process means installation without disruption: the systems arrive working, and your staff barely notice us.

See how OKTOLabs works

04 · Programme

When your programme changes

OKTO offsite integration control room with control panels and test benches

Construction programmes move. Dates change, designs change, priorities change — often while the systems are already being built.

We plan meticulously, coordinate closely with every stakeholder, and react quickly when your programme demands it. When a problem appears — and on complex projects it always does — we fix it rather than write letters about it. No excuses, and it never becomes your problem.

Where standard products won't do what your project needs, we develop bespoke controls in house, working directly with the suppliers, so you get exactly the engineering the building requires — not the nearest off-the-shelf compromise.

What clients say about us

The factory acceptance tests we have been involved with the last couple of days have been a resounding success and cement the positive influence OKTO have had on the Peninsula Project. OKTO have continued to outperform the norm at every turn.
Matt Howe · Building Services Manager, Sir Robert McAlpine

Who we work with

Main contractors

The final three months are where margins go to die. One accountable owner of the digital integration environment changes the shape of the programme.

M&E contractors

The interfaces between packages are where the risk lives. Single-point responsibility for the building technology scope, and one number to call.

Estates directors

Hundreds of critical systems, each raising its own alerts. CIDE-OS translates the live state of the estate into the language of consequence — what it means, and what to do next — closing the gap between the data and the decision.

Corporate occupiers

Every room has to work for the people in it and the people at home. Standardised AV estates, installed without disturbing a working office, supported after handover.

Trusted by

  • Sir Robert McAlpine logo
  • Hilton Hotels & Resorts logo
  • Waldorf Astoria logo
  • The Peninsula London logo
  • Schneider Electric logo
  • Knight Build logo
  • Allstate logo
  • CPC London logo
  • Concept Bespoke logo

Clients

Admiralty Arch meeting room with audio visual and lighting control
Status // Operational

Waldorf Astoria Admiralty Arch — meeting room

Dressed rack under test at OKTOLabs
Stage // Integration

Rack dressing at OKTOLabs before delivery

AV rack concealed inside joinery
Philosophy // Design

The technology has to be perfect, and it has to disappear

Mayfair Park Residences lounge with integrated lighting control
Status // Operational

Mayfair Park Residences — lighting controls

View case studies

After handover

Serene corridor with layered arches and warm cove lighting in a finished, handed-over space

Handover is not the finish line — it's the day your client starts living with what we built.

The same team that delivered your project looks after it afterwards. When something needs attention, you get a fast response from people who know the building — not a ticket number. Your snag list closes, and stays closed.

Your reputation with your client doesn't end at practical completion, and neither does our responsibility to you.

You made a promise to your client. Our job is to make sure you keep it.

Start conversation

Talk to a director today — not an account manager.